| Status |
Start Date |
End Date |
SubCategory |
Title |
Current Disposition |
|
Ongoing
|
2025/10/05 |
2025/10/05 |
Action_Items |
Landscpape Contract |
|
|
Ongoing
|
2025/10/05 |
2025/10/05 |
Action_Items |
2025 SCC Filing |
|
|
Ongoing
|
2025/10/05 |
2027/03/01 |
Action_Items |
2027 Drain Field Inspection |
|
|
Ongoing
|
2025/10/05 |
2025/12/31 |
Action_Items |
2025 Financial Audit |
|
|
Ongoing
|
2025/10/05 |
2025/10/05 |
Action_Items |
2025 Dock Repair (widen slips & fix pillings) |
|
|
Ongoing
|
2025/07/29 |
2025/07/29 |
Action_Items |
2025 Replacement of SWS Buoy |
|
|
Ongoing
|
2025/06/10 |
2025/10/31 |
Action_Items |
2025 John's Johns maintenance |
|
|
Ongoing
|
2025/06/10 |
2026/05/30 |
Action_Items |
2025 Picnic table sanding and staining |
|
|
Completed |
2025/06/10 |
2025/07/16 |
Action_Items |
2025 Notify POA of new Board members |
|
|
Completed |
2025/06/10 |
2025/06/30 |
Action_Items |
2025 Solar Lights for entrance |
Solar lights purchased and installed at front entrance. |
|
Completed |
2025/06/10 |
2025/06/25 |
Action_Items |
2025 Solar Lights on boat dock |
Solar lights were replaced on the boat dock |
|
Completed |
2025/06/10 |
2025/10/05 |
Action_Items |
2025 Seawall needs repair |
Seawall repaired by digging out gravel on inside of wall, resetting wall and screwing it in with 5 inch screws. Gravel was then replaced and top rail was resecured. Looks great. |